
OrbitAID plans December refuelling demo ahead of 2027 commercial mission
Company rendering: OrbitAID. Proposed tanker satellite, not a photograph of the December spacecraft.Chennai-based OrbitAID plans a satellite docking and refuelling demonstration in December 2026, followed by a commercial mission targeted for the end of 2027, founder and CEO Sakthikumar Ramachandran told Business Standard on November 22.
The demonstration has a specific scope: a mini tanker satellite will transfer green propellant between two units inside the spacecraft, which contains two internal fuel tanks and an inspection payload. It is not yet a demonstration of refuelling a separate customer satellite. The company rebuilt the spacecraft after the January PSLV-C62 launch anomaly derailed its earlier AayulSAT payload mission.
OrbitAID develops the Standard Interface Docking and Refuelling Port, or SIDRP, alongside tanker satellites and robotic hardware for on-orbit servicing. Its company pages describe docking and fluid-transfer tests on zero-gravity flights in November 2024 and May 2025. Those tests took place in microgravity flights, not in orbit.
The company is in the final stages of closing a Series A, Business Standard reports. No round amount or completed close was disclosed. The funding is intended for an in-space demonstration, servicing facilities, commercial development of SIDRP and team growth.
OrbitAID says it has agreements with two international satellite operators for the planned commercial mission. They were not named in the report. Its proposed orbital jetpacks, which would attach to existing satellites and provide propulsion, remain a future service rather than an operating capability demonstrated by this mission.
Founders: Sakthikumar R (Founder and CEO); Nikhil Balasubramaniam (Co-founder and COO); Mano Balaji K (Co-founder and CSO).
Mission dates, demonstration scope and current financing status: November 22 Business Standard founder interview. Hardware and microgravity-test history: OrbitAID. Timelines and commercial agreements are company statements; the demonstration has not yet flown.
Additional reporting
Internal docking and green-propellant transfer planned for December 2026.
End of 2027, according to the founder interview.
Series A in final closing stages. Amount not disclosed; not a completed round.
SIDRP docking and refuelling interface, tanker satellites and robotic servicing hardware.
Chennai, India


